Quote:
Originally Posted by Canuck53
Wow 4 days must be a well oil machine. Great time looking through the pictures. Now the real challenge....the wait
|
I say 4 days, it was 4 days in main production building (which is same build time from a gasser to a King Aire). Prior to main production it spends 2-3 days in chasis prep for floor, basement plumbing, etc.
Yes the wait for the next 4 weeks will be tough!!