Has anyone replaced their Norcold 1200 with Samsung RF197 in an 03 Windsor 3 slide PST? My refer compartment under the Norcold 1200 is a space for storage, but there is a big bundle of wires the come up on left side of storage and goes across to right side of storage area. My concern is how to route those wires so I can lower the floor to accommodate the new RF197 refer. If anyone has already done this I would appreciate how you did it. Pictures would be great.
Thanks,
Lowell
03 Windsor PST