How to block up a TT on a permanant site?
Been looking at a lot of ways online others have done it, and many use existing stabs and some additional stabs (or even jack lifts from Harbor Freight). Others are big on cement blocks. I'm guessing since the weight is distributed, the tongue, wheels, stabs, and some jack stands all sharing the weight would thus distribute the weight to under a 1/2 ton per distribution point? Trailer will weigh about 9000 lbs. all loaded out.
Looks like putting two lifts on the frame where each slide (close to each end) might be a good idea too?
__________________
TT: 2014 Puma 32DBKS
TV: 2012 Ford F-250 4x4, 6.2L
|