And don't forget to warm it up. Run it unloaded for two to five minutes before you exersise it, and cool it off by running it unloaded two to five minutes. I start mine while still plugged in to shore power and run it unloaded for a few minutes to warm it up. I then open the shore power cb at the post to switch power to genset and load it up. Run it loaded for a half hour or more, then I unload it completely, and close the shore power cb and allow the gen set to run for a few minutes unloaded before I shut it down.
__________________
Cheers,
TonyMac
2006 Monaco Safari Cheetah 40PMT
|