-----------
Pre comment, in Honor and memory of George Michael's birthday, this will be the soundtrack for this comment, just let it play in the background as loud as you can.
end pre-comment
------------
Well it is finally done, the entire re-plumb of shower with recirculating to tank option & pressurized bladder tank.
Had to re-solder main unit 3 times to get it small enough to fit.
Took 4 attempts a larger wall plate, and the 4th configuration to make it fit.
Plumbing bay saw a massive amount of changes without taking up 1 more inch of space. Bladder tank on right will stabilise water pressure to about 35 pounds. New water pump & pre-screen, the anti vibration yellow extensions. yellow return to tank line from shower & secondary drivers side tank fill line.
White line is for external water source for outside shower that was added last year. Soundtrack should be over about now........
Wand shut off is still there but it is not need, it is a job better done by the wall valve. Up is off, one turn right is recirculate to tank, 3rd click to right is shower wand.