Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
RV Trip Planning Discussions

Go Back   iRV2 Forums > iRV2.com COMMUNITY FORUMS > iRV2.com General Discussion
Click Here to Login
Register FilesVendors Registry Blogs FAQ Community Calendar Today's Posts Search Log in
Join iRV2 Today

Mission Statement: Supporting thoughtful exchange of knowledge, values and experience among RV enthusiasts.
Reply
  This discussion is proudly sponsored by:
Please support our sponsors and let them know you heard about their products on iRV2
 
Thread Tools Search this Thread Display Modes
 
Old 05-31-2016, 08:26 PM   #29
Senior Member
 
Mr_D's Avatar
 
Country Coach Owners Club
Solo Rvers Club
iRV2 No Limits Club
Join Date: May 2011
Location: Vancouver, WA
Posts: 37,725
Over my 30 years with the WA DOT one of my many jobs was inspecting concrete right from the materials at the plant to final placement in the bridge or on the roadbed and cutting expansion joints. Still dislike getting my hands in the mix!
__________________
2009 45' Magna 630 w/Cummins ISX 650 HP/1950 Lbs Ft, HWH Active Air
Charter Good Sam Lifetime Member, FMCA,
RV'ing since 1957, NRA Benefactor Life, towing '21 Jeep JLU Rubicon Ecodiesel
Mr_D is offline   Reply With Quote
Join the #1 RV Forum Today - It's Totally Free!

iRV2.com RV Community - Are you about to start a new improvement on your RV or need some help with some maintenance? Do you need advice on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that iRV2 is a great community to join. Best of all it's totally FREE!

You are currently viewing our boards as a guest so you have limited access to our community. Please take the time to register and you will gain a lot of great new features including; the ability to participate in discussions, network with other RV owners, see fewer ads, upload photographs, create an RV blog, send private messages and so much, much more!

Old 05-31-2016, 10:47 PM   #30
Community Administrator
 
JohnRR's Avatar


 
Fleetwood Owners Club
Workhorse Chassis Owner
Join Date: Sep 2010
Location: Marquette, Michigan "Da UP" & Lehigh Acres Florida
Posts: 21,827
I waited 30 plus days.
__________________
John & Cathy R.
06 Pace Arrow 38L Workhorse W24
08 14 Lincoln MKX AWD 06 Lincoln Mark LT 4X4, 2020 Lincoln Corsair
See My Pace Arrow Upgrades
JohnRR is offline   Reply With Quote
Old 06-03-2016, 08:01 PM   #31
Senior Member
 
Winnebago Owners Club
Join Date: Mar 2016
Location: Michigan
Posts: 648
Reply Number 25 by ionfu and reply number 26 by CampDaven Cover everything you need to know about concrete. They nailed it. Great info ,guys.

John M
john fran is offline   Reply With Quote
Old 06-03-2016, 09:28 PM   #32
Senior Member
 
Old Radios's Avatar
 
Join Date: Feb 2014
Location: Upstate (the other) New York
Posts: 625
I waited a little over four weeks for the RV but put the cars and other lighter things in after two weeks. Crew that did ours also does all the big box store floors around here. Main thing I learned from them was that it will shrink and after you see the 1/8" gap around the outside edges it's pretty much cured enough for the heavy weight. They came in and made the cuts after a couple of days.

Been a year and a half with a northern winter and no problems.
__________________
2021 T@B 320 S Boondock
Upstate (the other) New York
Old Radios is offline   Reply With Quote
Old 06-04-2016, 08:08 AM   #33
Senior Member
 
lonfu's Avatar
 
Newmar Owners Club
Winnebago Owners Club
Freightliner Owners Club
Join Date: Mar 2016
Location: Kingman Az
Posts: 1,686
Quote:
Originally Posted by CampDaven View Post
I did lots of concrete in a previous life. The best slabs are water-cured. Set up sprinklers on a timer to wet (also cool) the surface.
However, the VERY BEST concrete is freeze-cured over winter (where available)


Dave and Nola, RV Mutants
I agree with you on the water cure. Silly contractor spayed diesel all over my house pad, when went to finish it, the thing looked like crapola and I had a hell of time getting enough of the diesel up to get the mud to stick for the tile.
__________________
May your black water hose never break!
lonfu is offline   Reply With Quote
Old 06-05-2016, 12:39 PM   #34
Senior Member
 
Winnebago Owners Club
Join Date: Mar 2016
Location: Michigan
Posts: 648
Smile

We had a section of freeway in downtown Detroit ,Mi. that was flooded after the pour,and let cure ,It lasted a good long time, before it needed repair .

Also ,in theory , concrete never stops curing, but we won't get into that ,at this time, those who know cement, understand.


John M
john fran is offline   Reply With Quote
Old 06-05-2016, 01:24 PM   #35
Senior Member
 
Winnebago Owners Club
Join Date: Mar 2016
Location: Michigan
Posts: 648
Another thing to be aware of is ,to make sure that your getting a full
4" or 6" thick slab.

Before the pour, run a string from side to side ,in all directions,keep it taut,then measure from string to the base in the center ,it should be the same as the edges.
Take several measurements, some contractors ,will (crown )the dirt in the center of a driveway or pad as it may be , in this case. I've seen grading (crowned ) by as much as 2" on a 4" thick driveway , 9 feet wide by 75 feet long ,that saves the contractor ,almost a yard of concrete. So , your slab cracks over time , Its called job security. LOL
john fran is offline   Reply With Quote
Old 06-08-2016, 01:50 PM   #36
Senior Member
 
CJ7ole's Avatar
 
Winnebago Owners Club
Ford Super Duty Owner
Join Date: Mar 2009
Posts: 1,129
Full rated concrete design strength (3500 psi, 4000 psi etc) is theoretically reached after 28 days in lab conditions, steam room cured. It will continue to gain some strength after that. If your slab is over designed, 7 days is the shortest time I would wait, otherwise 28 days, but make sure they cure it properly using a spray on membrane, plastic sheeting sealed around the edges, or otherwise continuously kept wet. Improperly cured concrete is a crap shoot, particularly with surface spalling. 40 years as a civil engineer.

Did my concrete drive 10 years ago 5" thick with poly fiber reinforcement over well compacted natural gravely sand, no steel reinforcement. Two years later I got my 20,000 pound rig, only one small crack after 8 years near the edge where a wheel went off near an expansion joint. I wouldn't put a heavy DP on it though, there 6" would work for the design I had. My dad, also an engineer, also told me about the Detroit highway where they flood cured the concrete.

Calculate exactly how much concrete you need and tell the contractor you want to see load tickets, both to verify the design mix and to verify they used as much concrete as the forms call for. And after sawcutting your joints 1/3 the depth of the slab, preferably 1/4" wide, seal the cracks with a foam backer rod topped with a concrete joint sealer. If you don't, as least in freezing areas, the joint intersections will likely pop out a triangle as water enters the cracks and freezes. Also discourages weeds and slab ants.

Tire psi vs concrete strength is irrelevant. If you overload the beam strength of the concrete to the point of cracking it will be due to total load, not tire psi. Usually due to poor base soils and/or preparation. Failure will likely not be by compression but tension in the concrete.
__________________
Ole and Anne Anderson, Highland, Michigan
'02 Adventurer 32V, Ford F-53, ours since 4/08,Hankooks, Konis, SeeLevel, CHF
'84 CJ-7 , 5.3 Chevy, 3" lift, 33's, Detroit Locker, Fiberglas tub, winch, hi-lift
CJ7ole is offline   Reply With Quote
Old 06-08-2016, 06:06 PM   #37
Member
 
Join Date: Mar 2016
Posts: 37
As a contractor I can tell you concrete is said to be at full strength at 27 days hope this helps
Springdale1 is offline   Reply With Quote
Old 06-09-2016, 05:21 AM   #38
Senior Member
 
Join Date: Mar 2013
Posts: 492
One thing to remember about concrete. People make blanket statements about how many days concrete take to cure but it depends on thickness,mix and weather. The concrete in the center of Hoover dam pored in the 1930's still hasn't cured and isn't expected to finish for about another 100 years.
MotorPro is offline   Reply With Quote
Old 06-09-2016, 01:37 PM   #39
doc
Senior Member
 
doc's Avatar
 
Appalachian Campers
Join Date: Sep 2002
Location: Dixie !! (north Georgia) USA
Posts: 4,114
In my younger days, working for my dad's company, we would keep a sprinkler on a large slab after the trowel (slick) finish for a few days. Cures better if it is kept wet or as someone said above 'steam conditions'. On occasion we used wood shavings and kept them damp during hot summer weather
doc is offline   Reply With Quote
Old 06-10-2016, 11:34 AM   #40
Senior Member
 
Join Date: Dec 2010
Posts: 599
CJ7ole:
Your are correct that concrete breaks from loading when the flexural or tensile strength is exceeded. The cracks that occur in concrete are usually from shrinkage which induces tension. It is rare for loading to cause cracks unless you have very poor sub-grade. A rough estimate of flexural strength is 10% of the compressive strength. Tire pressure is a very accurate measure of the applied load. Total load is not the key, it is the pressure applied to the concrete, which varies by the area of application (tire dimensions). Off-roaders often lower their tire pressures to minimize the amount the tires will sink into a soft road (sand or mud). The original question was when was it safe to drive on a new slab. It is safe long before the concrete is cured, the cracks will come from shrinkage and not from loading. A women walking in high heels will exert will over 200 psi on the surface, far more than 20,000 lb MH
coachmanjay is offline   Reply With Quote
Reply



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Pitch for concrete pad dilemma ctcamper MH-General Discussions & Problems 8 06-24-2011 05:36 PM
Concrete pad H. Miller iRV2.com General Discussion 17 04-11-2010 06:33 PM
Concrete Pad RayandPamT Class A Motorhome Discussions 12 05-13-2009 06:10 AM
When Parked on a Concrete Pad Latitude MH-General Discussions & Problems 15 01-13-2008 05:12 PM
Sealing The Concrete RV Pad Gordon iRV2.com General Discussion 10 09-30-2007 05:21 AM

» Featured Campgrounds

Reviews provided by


All times are GMT -6. The time now is 06:56 AM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2024, vBulletin Solutions, Inc.