 |
|
03-07-2022, 05:28 PM
|
#113
|
Member
Join Date: Feb 2018
Location: Central CT
Posts: 50
|
Neighbor ordered his GMC 2500 last March, yes March of 2021, took delivery this past Saturday!
__________________
2006 Ford F250
2018 FR Rockwood 8244BS
|
|
|
 |
Join the #1 RV Forum Today - It's Totally Free!
iRV2.com RV Community - Are you about to start a new improvement on your RV or need some help with some maintenance? Do you need advice on what products to buy? Or maybe you can give others some advice? No matter where you fit in you'll find that iRV2 is a great community to join. Best of all it's totally FREE!
You are currently viewing our boards as a guest so you have limited access to our community. Please take the time to register and you will gain a lot of great new features including; the ability to participate in discussions, network with other RV owners, see fewer ads, upload photographs, create an RV blog, send private messages and so much, much more!
|
03-07-2022, 05:38 PM
|
#114
|
Senior Member
Join Date: Feb 2020
Location: N. Florida
Posts: 218
|
I've got a friend who's had his F250 in the shop for six weeks. Seems the dealership is spending all its efforts on prepping used cars/trucks for the lot because they have nothing new to sell. Boy is he torqued......
__________________
2020 Ford F-350 6.7 PS King Ranch SWB B/W Companion Slider
2021 Grand Design Solitude S 2930RL-R (#5)
Navy Veteran - IT Specialist/Examiner/Auditor
|
|
|
03-08-2022, 12:10 PM
|
#115
|
Senior Member
Join Date: Dec 2006
Location: Foxboro Ma.
Posts: 1,023
|
A friend of mine just picked up a truck that was ordered around March 2021, it shows it was built and waiting for delivery. The build date when he picked up the truck was August of 2021 and finally got to the dealer the first week of March 2022. I think there is some parts they are missing after they come line and then they are delivered to some yard closer to the dealer where the car/truck are sitting for months waiting for final assembly. Why else would these HD truck have credit on the build sheet for deleting items like rear seat heat?
__________________
2015 42' Redwood RL38 Morryde IS , disk brakes, 1920W of solar with Victron everything,Battleborn, 2020 GMC DRW 3500HD Hensley BD5 air ride hitch
|
|
|
03-08-2022, 08:16 PM
|
#116
|
Senior Member
Outdoors RV Owners Club
Join Date: May 2020
Location: Wenatchee
Posts: 184
|
Ordered a F250, XLT Premium, 7.3, FX4, E locker, On November 29, 2021 and it is supposed to be here by March 20th. Dealer said the fast turn around was due to lower trim level.
__________________
2017 ORV Creekside 21RBS, 410 watt solar, 2 group 27,
Honda 2200i...
2022 F250, SCSB, 7.3, XLT, 4X4, EL. Equilizer 4 way
|
|
|
03-09-2022, 07:13 AM
|
#117
|
Senior Member
Join Date: Apr 2016
Posts: 832
|
My F150 adventure continues. Because I lease the truck, I went into my dealer last March to place an order. I wanted to try the continuous controlled damping. As a result, the order could not be submitted until "Job 2" which was end of last June. Order was finally "confirmed" 10/1. As of this morning it is listed as "in production" and I was able to download my window sticker. Truck is a platinum trim level.
I was beginning to wonder if I was going to end up with a 2023!
__________________
Al  SE Michigan, F-150 Plat SCrew, Flagstaff 26FKWS, ProPride
Tolerance will reach such a level that intelligent people will be banned from thinking so as not to offend the imbeciles. Fyodor Mikhailovich Dostoevsky, Russian Novelist
|
|
|
03-19-2022, 01:56 PM
|
#118
|
Senior Member
Join Date: Apr 2016
Posts: 832
|
My F150 is finally in. It's been a long journey. Hearing that getting trucks built was going to take time, I visited my dealer way before I normally would, last March. At that time, while the active damping feature had been announced, orders were not accepted until Job 2 for the 2021s. That happened near the end of June and my order was accepted by June 21. Then with all the delays, it got converted to a 2022. Got a VIN assigned in Feb and built March 9. I stopped by the dealership today to take a quick look at it and am happy. Truck is Platinum trim SuperCrew 4x4. I added the 2K power option with the 3.5 EB engine. I have been worrying about cargo and am relieved that it came in at 1525 lbs. Since we travel light in the truck, this is more than sufficient for our needs, it's more than 100 lbs. higher than the original F150 I used to pull our trailer.
__________________
Al  SE Michigan, F-150 Plat SCrew, Flagstaff 26FKWS, ProPride
Tolerance will reach such a level that intelligent people will be banned from thinking so as not to offend the imbeciles. Fyodor Mikhailovich Dostoevsky, Russian Novelist
|
|
|
03-20-2022, 05:43 AM
|
#119
|
Senior Member
Join Date: Nov 2021
Location: Ontario
Posts: 145
|
After an 11 month wait I finally picked this up about a week ago.
F350 Lariat gas 7.3/4.30.
|
|
|
03-20-2022, 03:45 PM
|
#120
|
Junior Member
Join Date: May 2021
Posts: 7
|
Finally getting into the game. Placed my order for F250 Lariat ccsb with 7.3 on 3/9. Got the email that it is scheduled for production the week of 5/2 on 3/17. The wife wants to wait until next year to buy a tt, but after the truck gets here I may be able to talk her into moving a little quicker on that.
|
|
|
03-20-2022, 04:46 PM
|
#121
|
Senior Member
Join Date: Sep 2012
Location: Palm Coast Florida
Posts: 11,848
|
I just drove past a few dealerships, one Ford and one Ram. Neither dealer had many trucks. Maybe about a dozen total each. They usually would have 75.
|
|
|
03-23-2022, 02:05 PM
|
#122
|
Senior Member
Join Date: Mar 2014
Posts: 202
|
ordered f250 diesel platinum cc oct 27....was delivered last week
|
|
|
03-30-2022, 11:18 PM
|
#123
|
Member
Grand Design Owners Club
Join Date: Dec 2016
Posts: 46
|
Gmc 3500 drw
We ordered a GMC 3500 DRW on March 7th with no projected delivery time provided other than, "hopefully, sometime this year".
Surprisingly, the dealer contacted me on March 21st and said that I now had a targeted build date of April 14th. He said that "normally" the truck would arrive about 30 days after the build date, but during these times it could take up to 60 days. He said that he would contact me during the week of April 14th and let me know how things are proceeding.
When I originally placed the order, I was expecting a late Summer or early Fall delivery. Anything earlier than that would be a bonus as far as I'm concerned.
|
|
|
04-21-2022, 07:10 PM
|
#124
|
Junior Member
Join Date: May 2021
Posts: 7
|
Just received notice that my truck is in production now. It was originally scheduled for week of 5/2, but was moved up to week of 4/25. Not sure it's actually being built now, or if all of next week's run is being staged and shifted into the in production status.
|
|
|
04-22-2022, 12:47 AM
|
#125
|
Member
Grand Design Owners Club
Join Date: Dec 2016
Posts: 46
|
Our GMC 3500 was ordered on 3/7/22. I was notified today that it came off the assembly line at the Flint factory on 4/22/22 and was provided with the VIN. Should be at my dealer's within two to three weeks.
|
|
|
04-22-2022, 05:18 AM
|
#126
|
Senior Member
Join Date: Aug 2019
Location: Dayton, Ohio
Posts: 347
|
Lead times are all over the place, for all of the big 3. I hear everything from a year to the normal 4-6 weeks. Doesn't seem to matter what trim level you buy either.
__________________
2006 Keystone Montana 3500RL
2016 Ram 2500 w/Air Bags & Slider Hitch
|
|
|
 |
|
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
|
|
Thread Tools |
Search this Thread |
|
|
Display Modes |
Linear Mode
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
» Recent Discussions |
|
|
|
|
|
|
|
|
|
|
|
|
|