RV News RVBusiness 2021 Top 10 RVs of the Year, plus 56 additional debuts and must-see units → ×
RV Trip Planning Discussions

Go Back   iRV2 Forums > Members List
Click Here to Login
Join iRV2 Today

Mission Statement: Supporting thoughtful exchange of knowledge, values and experience among RV enthusiasts.
Tootmag is an unknown quantity at this point

Tootmag Tootmag is offline

Junior Member

Profile Comments

Showing Profile Comments 1 to 1 of 1
  1. Scottybdivin
    Hello. When you have a clay sub grade, it is going to require a little more work. Proper drainage is key. If you are on a cross slope, you need to channel runoff around the pad. If you think you will ever pave it or build a structure on top of it in the future, then you need to do it right the 1st time. You first need to moisture condition and compact the clay subgrade. This is done by scarifying (plowing) the top 6" and adding water, and re-compacting. Then you need to import the crushed limestone road base. I would use a minimum of 8" - 12", placed and compacted in two or three 4" lifts. The base needs to be moisture conditioned as it is being place as well. Once the base is compacted in place, I used a top dressing of about 1" of pea gravel. This keeps the base from tracking and make a clean surface to drive/walk on.

    Hope that helps

About Me

  • About Tootmag
    City
    Keller
    State or Province
    Texas
    Country
    Us

Statistics

Total Posts
Profile Comments
Blog
General Information
  • Last Activity: 09-27-2020 05:13 PM
  • Join Date: 03-24-2019
  • Referrals: 0

All times are GMT -6. The time now is 06:16 PM.


Powered by vBulletin® Version 3.8.8 Beta 1
Copyright ©2000 - 2021, vBulletin Solutions, Inc.